Contractor inputs
Drawings and a representative area, diameters and spacing, tie requirements, actual labour costs, schedule and lead engineer contact.
RSTC is the organisation. CTN BOT is our first robotic product for tying horizontal reinforcement mats.
Explore CTN BOTWe connect mechanical design, engineering review and site economics. Manufacturing and physical verification come next. Partnership is built on data, acceptance criteria and a joint decision.
Meet the teamThe next gate is a physical bench. Series readiness and a delivery date have not been declared.
Detailed R25-041 CAD preserved.
Geometry and conditional simulations. R25-048 running-gear branch.
Manufacture, mass, STOP, currents, return and actual ties.
Site geometry, output, quality, climate and maintenance.
Measured comparison. Refinement and industrial qualification decision.
We invite a technical partner to prepare a pilot. Site testing starts only after bench qualification and safety agreement.
Drawings and a representative area, diameters and spacing, tie requirements, actual labour costs, schedule and lead engineer contact.
Technical review, configuration and measurement protocol. A segregated area, verified STOP, trained operator and contractor approval before startup.
Cost per accepted tie, rejection rate, output, downtime, setup time and HSE observations. A joint report and a continue, refine or stop decision.